Remediation – Abbotsford Water Ingress
Project Overview
This project focused on resolving significant water ingress affecting the restaurant located beneath the Level One pool area. FACE was engaged to strip back the existing finishes, expose the failed waterproofing system, and deliver a fully compliant reconstruction that restored the integrity of the pool surrounds and protected the tenancy below.
Scope of Works
FACE was engaged to:
• Remove the existing 150m² deck to access the failed waterproofing
• Remove all pool services and associated infrastructure to expose substrates
• Remediate and install new waterproofing to the floor area and planter boxes
• Reinstate all pool services and rebuild the deck to current compliance standards
Key Considerations
• Restricted access: All materials and equipment were hand-carried from Ground Floor to Level One via internal corridors, requiring careful sequencing and logistics planning..
Value Range
$500,000-$1,000,000
Project Duration
6 months
Client
Owners Corporation/ OCVM/ PASG